Title Izvođenje radova na rekonstrukciji prostora i odjela Zavoda u Kliničkom bolničkom centru Rijeka
Title (english) Realisation of reconstruction intervention premises and departments of the Institute at the Clinical hospital center Rijeka
Author Toni Ivanović
Mentor Iva Mrak (mentor)
Committee member Ivan Marović (predsjednik povjerenstva)
Committee member Marko Franković (član povjerenstva)
Committee member Iva Mrak (član povjerenstva)
Granter University of Rijeka Faculty of Civil Engineering Rijeka
Defense date and country 2019-07-08, Croatia
Scientific / art field, discipline and subdiscipline TECHNICAL SCIENCES Architecture and Urbanism Architectural Design, Building Physics, Materials and Construction Technologies
Scientific / art field, discipline and subdiscipline TECHNICAL SCIENCES Architecture and Urbanism History and Theory of Architecture and Protection of the Architectural Heritage
Scientific / art field, discipline and subdiscipline TECHNICAL SCIENCES Architecture and Urbanism Architectural Design
Abstract Rekonstrukcija je bitna stavka u održavanju i korištenju postojećih objekata. Rekonstrukcije su potrebne kako bi objekt zadovoljavao današnje standarde te kroz godine korištenja da se obnovi i adekvatno organizira unutrašnjost objekta potrebama korištenja prostora.
Radovi na postojećem objektu uvijek predstavljaju izazov u projektiranju potrebnih izmjena. Izrada projekta zahtjeva kvalitetnu pripremu, pregled objekta te istraživanje starih postojećih projekata. Pregledom objekta ustanovljava se kvaliteta konstrukcije, stvarno izvedeno stanje dijelova objekta, postojeće instalacije. Tokom pregleda prolazak kroz zahvat na objektu treba odraditi s korisnikom da bi se dobila informacija o problemima koji se ne vide za vrijeme obilaska kao na primjer curenje za vrijeme kiša. Svaka informacija koja se dobije na licu mjesta rekonstrukcije pomaže u izradi kvalitetnijeg projekta te se smanjuje mogućnost nepredviđenih radova.
Pregled postojećih projekata objekta vrlo je bitan zbog nosive konstrukcije, korištenih materijala, pozicije instalacijskih vodova struje, vode te odvodnje. Pozicije instalacija su bitne jer rekonstrukcija objekta, u koliko je prevelik da se u cijelosti rekonstruira, vrši za dio objekta te se spaja s postojećim instalacijama i prostorom. Naravno instalacije na koje se spajaju moraju biti provjerene. Provjere ovise o vrsti instalacija kao na primjer kvaliteta žice elektroinstalacija, ravnost odvodnih cijevi, stanje dovodnih cijevi vode.
Pri izradi radova na vanjskom, vidljivom dijelu mora se paziti da rekonstrukcija bude skladna s postojećem dijelom te vidljivo ne odstupa od cjelokupnog izgleda objekta.
Kod rekonstrukcije djela bolnice, rekonstrukcija mora zadovoljavati uvijete i standarde bolnice novog doba. Čiste površine, lako za održavanje, količina svijetla, oznake i dostupnost svih javnih dijelova objekta, ovo su samo dio elemenata koje treba uzeti u obzir te pridržavati potrebnih standarda i pravila pri izvođenju i projektiranju rekonstrukcije u objektu bolnice.
Prostori u bolnicama se mogu podijeliti na tri bitna dijela: prostor soba za pacijente, prostor za liječnike te prostor operacijskih sala i infrastrukture. Prostori operacijskih sala i infrastrukture gdje se nalaze strojevi kao što su magnetska rezonanca nisu uvijek dostupni za rekonstrukciju te je potrebno isplanirati njihovu obnovu. S obzirom da se ti prostori mogu
sanirati svakih nekoliko godina, najčešće kada stroj ide u izmjenu, za vrijeme koje je prošlo i standardi bolnice su se promijenili te se prostor mora adekvatno pripremiti za novi uređaj. Da bi se moglo održavati kvalitetan standard prostor je potrebno djelomično rekonstruirati. Pri rekonstrukciji prostora bitno je izbjegavati statički bitne elemente objekta da bi se radovi ubrzali i olakšali te da se cijena radova smanji no i da se rok izvođenja radova ne odulji. Svaka rekonstrukcija postojećih objekata koja zahtjeva izvođenje radova na stabilnosti objekta je složena te je bitna kvalitetna priprema. Suprotno će doći do nepredviđenih radova koji će uvelike produljiti rok izvođenja radova. Nepredviđeni statički radovi zahtijevaju mnoge izmjene projekata, provjeru statike objekta, suglasnost korisnika. Ukoliko se ovi elementi odrade u vremenu kada se planira i radi projekt izvođenje radova neće doći u pitanje i otvorenje prostora će biti na planirani datum. Kada se mijenja projekt dolazi do problema da izvođač ne može izvoditi radove dok se dobije sva potrebna izmjena projekta i odobrenja te osiguranja postojećeg objekta za izvođenje zahvata.
U ovom radu fokus je na pripremnim radovima kao i demontaži i rušenju potrebnih dijelova objekta te problematika koja se javlja za vrijeme izvođenja nepredviđenih radova. Rješenja problema tokom izvedbe se prikazuju kao i njihovo postupno rješenje te opis. Uz problematiku, prikazuje se postupak izrade dijela obrtničkih radova koji su u skladu s bolničkim standardima te njihova izvedba.
Abstract (english) The reconstruction is an important part of maintaining and use of existing buildings. The reconstructions are important for the buildings so they can adapt to be adequate for modern standards and to renew the inside space for better and more adequate use of space.
Making the designs for reconstructed buildings is always a challenge. Quality preparation, checking current situation of the building, reveiw of old designs is all part of making a design for the reconstruction. By checking current situation and place that needs renovation we can check current state of construction and statics, actuall dimensions and possible design changes, existing placement of instalations for water, electricity, ventilation, ect. During this checkout user opinion is always good to gather more informations of current problems building might already have, for example a rain leak in part of the building. Every information we get is a step closer to making a good reconstruction design with fewer unpredictable problems during execution time.
Review of existing parts is also important so we can check supporting parts of the building, used materials, position of all instalations. Current state of instalations is very important if reconstruction is done in only one part of a building. New instalations have to connect to older parts and we have to be sure that old instalation is in condition to support and be adequate to new one. All of the old instalations must be checked. Checking depends on different kind od instalation parts. With elecrtic parts we have to check quality of wires. In drainge sistem we have to check the fall of the pipe and inner layer of the pipe. Water supply pipes have to be checked for corrosion and type of material used.
If working on opened space and facades, new parts have to be visually compatible with the old parts.
The reconstruction of a hospital wing also has to also satisfy conditions and standards of hospitals of the modern standard. Clean surfaces, easy maintenace, light level, instructions,
availability of public parts of the hospital are just some of the standards we have to uphold while working on design.
An iniside of a hospital can be categorised to three main parts: pacient's areas, doctor's areas and area for operating rooms and infrastructure. Operating rooms and infrastructure are rooms where we can find magnetic resononance machine. These kind of rooms are not always available for the reconstruction. A further planning is neceserry for these kind of reconstructions. The reconstruction of these areas if planned every few years, should be in accordinance with hospital and the new area must be adequately prepared. While renovating said areas we should avoid statically important parts fo the building to deminish cost and time needed to finish the work. All work in existing buildings that need to change statics of a building needs a carefull and good preparation. If we dont anticipate this kind of work and it is needed for the reconstruction of a building, the cosnt and time needed for it is a lot more than predicted. While this kind of work is planned in design we can spend time to think it threw, but if the problem occures while working on the site, isolating the problem and fixing it takes a lot of time and is not good for planing and executing the reconstruction.
In this paper the focus is on preparatory works, deconstruction and demolition of neceserry parts of the building, problems that may occure during reconstruction and solutions for them. Problem solving during execution time and their progressive solution are shown. With problem solving we show procedure of craft works which are in accordinance to hospital standards and their execution.
Keywords
rekonstrukcija
izvođenje radova
Kliničko bolnički centar
Rijeka
Keywords (english)
reconstruction
realisation
Clinical hospital center
Rijeka
Language croatian
URN:NBN urn:nbn:hr:157:399183
Study programme Title: Civil Engineering; specializations in: Building in Coastal Region and Infrastructural Engineering Course: Building in Coastal Region and Infrastructural Engineering Study programme type: professional Study level: specialist graduate Academic / professional title: stručni/a specijalist/specijalistica inženjer/inženjerka građevinarstva (stručni/a specijalist/specijalistica inženjer/inženjerka građevinarstva)
Type of resource Text
File origin Born digital
Access conditions Access restricted to students and staff of home institution
Terms of use
Created on 2019-09-25 10:47:55